DIEBOLD ROAD OVER ELY RUN


precast arch bridge
The first ECO-SPAN® arch installed in the State of Indiana, this 28’ span replaced a short-span prestressed concrete beam bridge as part of a road reconstruction and widening project. The precast concrete headwalls support an Indiana Department of Transportation (INDOT) guardrail system. The foundation is supported by driven HP 12×53 steel piles. Even with poor weather delaying installation, Pioneer Construction was able to meet the required completion date.

Download PDF

FORT WAYNE, INDIANA


Installed October, 2011


PROJECT TEAM MEMBERS

Owner:  Allen County Highway Department
Engineer:  GAI Consultants
Contractor:  Pioneer Construction
Precast Producer:  Independent Concrete Pipe Company


TECHNICAL DETAILS

Span:  28 feet
Rise:  11 feet
Length:  55 feet
Cover:  2.5 feet
Live Load:  HL-93
Skew Angle:  0 degrees
Type:  ARCH-BOX
Finish:  Plain Concrete