SR 445 OVER CR 150N


PreTek Group worked with E&B Paving to propose a successful Cost Reduction Initiative (CRI) to the Indiana Department of Transportation (INDOT). The grade separation was originally designed as a prestressed box beam bridge with pile-supported abutments wrapped in mechanically stabilized earth (MSE) walls. The twin-leaf ECO-SPAN® Versa™ series Multiple-Radius Arch allowed for elimination of the pile foundation system. Instead, the bridge was supported by strip foundations placed directly on bedrock.The precast concrete twin-leaf arch underpass is the first of its kind for the INDOT, an agency that has made widespread use of precast three-sided structures for stream crossings. Site challenges included a grade separation of nearly 45 feet and a nearby karst bedrock feature which was capped prior to foundation construction. This structure is part of the new I-69 which will link Canada near Detroit with Mexico near Houston. The corridor is expected to see heavy traffic which this bridge will support for many years to come. With no exposed bridge deck, safety should be improved and INDOT’s future maintenance expenses reduced compared to the original design.
Download PDF

GREENE COUNTY, INDIANA


Installed JULY, 2014


PROJECT TEAM MEMBERS

Owner:  Indiana Department of Transportation
Engineer:  Pretek Group
Contractor:  E & B Paving
Precast Producer:  Lindsay Precast


TECHNICAL DETAILS

Span:  54 feet
Rise:  26.67 feet
Length:  56.33 feet
Cover:  18.33 feet
Live Load:  HL-93
Type:  VERSA™ MULTIPLE RADIUS
Finish:  Plain Concrete