US 31 AND RAMP C, STRUCTURE 12


The solution was a ECO-SPAN® 16’ Arch-Box structure specially designed to support up to 40’ of cover including the retaining wall. A single culvert carries all three roadways and a significant embankment over the stream.
Primco built a cast-in-place mat foundation to support the precast arch. Precast pieces were installed in several stages using a small crane. The end result is a quality, low-maintenance culvert that allows easy access for inspection .