PROJECT DETAILS

  • Location: Castle Rock, Colorado
  • Installed: October, 2013
  • Owner: Town of Castle Rock
  • Engineer: JVA Consulting Engineers
  • Contractor: Turner Construction/Rocky Mountain Excavcating Inc.
  • Precast Producer: Lindsay Precast - Firebaugh Division

TECHNICAL DETAILS

  • Span: 32 feet
  • Rise: 11 feet
  • Length: 48 feet
  • Cover: 3.5 feet
  • Live Load: HL-93
  • Skew Angle: None
  • Type: Arch-Box
  • Finish: Plain Concrete

DESCRIPTION

Phillip S. Miller Park and Field House
32’ Span x 11’ Rise Arch-Box

Originally designed as a corrugated metal culvert, Turner Construction and Rocky Mountain Excavating worked with JVA Consulting Engineers to provide a major upgrade – an aesthetically pleasing precast concrete arch for the new 48-acre park. The structure carries the park’s drainage channel and a walkway under a bike and pedestrian path.