PROJECT DETAILS

  • Location: Jefferson County, Ohio
  • Installed: May, 2016
  • Owner: Ohio Department of Transportation
  • Engineer: Woolpert
  • Contractor: Ohio-West Virginia Excavating Co.
  • Precast Producer: Lindsay Precast

TECHNICAL DETAILS

  • Span: 54 feet
  • Rise: 25.25 feet
  • Length: 120 feet
  • Cover: 6 feet - 20 feet
  • Live Load: HL-93
  • Skew Angle: None
  • Type: Twin-Leaf Versa™ Series Multiple Radius
  • Finish: Plain Concrete

DESCRIPTION

S.R 213 Over Island Creek
54’ Span x 25.25’ Rise Twin Leaf Versa™ Series Multiple Radius

A new structure was needed to replace a 3-span box culvert built in 1949 at a state road near Steubenville, Ohio. To limit road closure time and a nearly 8-mile detour, Woolpert and the Ohio Department of Transportation selected a precast concrete arch bridge. The 54-foot clear span eliminated the existing structure’s piers in the channel, reducing the chance of debris build-up, flooding and future maintenance requirements. The precast arch culvert was a perfect fit to carry the nearly 20 feet of earth cover, creating a 40-foot grade separation from stream bed to roadway.