Perfect Fit

  • Perfect Fit
  • Perfect Fit

PROJECT DETAILS

  • Location: Hardin County, Kentucky
  • Installed: September, 2012
  • Owner: Kentucky Transportation Cabinet
  • Engineer: QK4, Kentucky Transportation Cabinet
  • Contractor: Central Bridge
  • Precast Producer: Independent Concrete Pipe Co.

TECHNICAL DETAILS

  • Span: 42 feet
  • Rise: 12 feet
  • Length: 164 feet
  • Cover: 20 feet
  • Live Load: HL-93 MOD
  • Skew Angle: 5 degrees
  • Type: Versa™ Multiple Radius
  • Finish: Plain Concrete

DESCRIPTION

Elizabethtown to Radcliff Connector
42′ Span x 12′ Rise Versa™ Multiple Radius

The first ECO-SPAN® arch installed for the Kentucky Transportation Cabinet was part of the construction of the Elizabethtown to Radcliff Connector in Hardin County, Kentucky. The efficiency of the variable-radius arch was perfect fit for the 35’ grade separation required at this site.

Central Bridge installed the 164’ long structure including precast headwalls and wingwalls in two days. Strip foundations bearing on limestone bedrock supported the precast concrete arch system.

Download PDF