When Sugarcreek Township built a new fire and police station, road improvements were needed to decrease response time to a new commercial development.
Clyo Road was widened from a narrow two-lane road to a boulevard with a median in an area where an existing precast arch was installed just a few years earlier.
The modular design allowed the existing arch to stay in place while matching extensions were added to each end, increasing the bridge width from 72’ to 96’. Eagle Bridge was able to install the extension with only a few hours of road closure.