The Kissing Tree development used limestone excavated from the construction process to help frame the main road leading into the community. Between the limestone walls, a bridge was needed to carry Dancing Oak Lane over the entry boulevard known as Center Point Road.
DNT Construction selected a Twin-Leaf Versa-Series 56’ span supplied by Speed Fab-Crete. Precast concrete wingwalls with a custom limestone façade create a stunning entrance to this upscale 55+ active adult community. A similar façade was used on the cast-in-place concrete abutments.